Project Background
Diversified Spaces furniture supports Career and Technical Education (CTE) at Oconto Falls Middle School in Wisconsin, providing furniture designed to support hands-on learning and technical skill development.
To align with the district’s summer installation schedule, the project was ordered in December 2024 through the Build & Hold program, with production completed in February 2025. By manufacturing the furniture ahead of peak installation season and holding it until it was needed, Diversified helped ensure the order was ready to ship at the beginning of summer. The Build & Hold program helps schools plan ahead, secure pricing and product availability, and coordinate furniture delivery with project timelines.
Forum Industrial Arts Four-Station Steel Workbench
Base consists of a double-faced heavy gauge steel unit, welded and riveted throughout. The unit provides 12 vertical locker openings which measure 12″W x 21″D x 15″H. Vented doors have spring loaded hinges, padlock hasp. Top is constructed of 2-1/4″ maple. Available with or without four vises. Available in either gray or black base units. Overall size: 64″W x 54″D x 33-1/4″H.
Forum All-Purpose Tool Cabinet
Cabinet is constructed of solid maple and maple veneer. The interior on the upper half, including the doors, is lined with 1/4″ pegboard. The lower half has one fixed and two adjustable 1″ plywood shelves. Both sets of doors include locks. Unit includes assorted tool pegs, mounted plug mold strip with six outlets, switch, breaker, cord, and plug. Three sizes of totes are sold separately. Overall size: 48″W x 22″D x 84″H.